
5-8
CHAPTER 5 CLEANING THE UNIT
Drain bolt
Glue
Glue
Spatula
Opening
7.
Loosen the drain bolt using the
screw wrench.
Loosen the bolt by turning it
counterclockwise until it is completely away
from the opening.
The glue will be discharged from the bottom
of the glue tank to the cardboard box you
placed in step 5.
8.
Scrape the glue remaining on the
bottom of the tank toward the
opening of the drain bolt using a
spatula.
9.
Tighten the drain bolt completely
after the glue has been discharged
from the tank.
Tighten the drain bolt when some level
of the glue is discharged. The glue in
the glue tank cannot be discharged
completely.
10
. Take out the glue discharged to the
cardboard box when it becomes
cool.
11
. Close the glue drain access and
fasten the fixing screw (1).
Small cover
12
. Slide the small cover to the left to
close it.
● The small cover and glue tank are
very hot. Make sure that you wear
protection gloves.
● Make sure that you close the small
cover. Otherwise, it may damage the
machine.
Summary of Contents for DPB-500
Page 15: ...Chapter 1 BEFORE OPERATION...
Page 36: ...1 22 CHAPTER 1 BEFORE OPERATION Memo...
Page 37: ...Chapter 2 PREPARING FOR OPERATION...
Page 59: ...Chapter 3 STARTING BINDING OPERATION...
Page 86: ...3 28 CHAPTER 3 STARTING BINDING OPERATION Memo...
Page 87: ...Chapter 4 FINE ADJUSTMENT AND OPTION SETTING...
Page 116: ...4 30 CHAPTER 4 FINE ADJUSTMENT AND OPTION SETTING Memo...
Page 117: ...Chapter 5 CLEANING THE UNIT...
Page 127: ...Chapter 6 TROUBLESHOOTING GUIDE...
Page 145: ...Chapter 7 APPENDIX...
Page 147: ...7 3 CHAPTER 7 APPENDIX Memo...
Page 148: ...11H 92832 0 09050000D This manual is printed on recycled paper to help protect the environment...