
2-2
CHAPTER 2 PREPARING FOR OPERATION
1. Turning On the Power
1.
Turn the power switch to the right to turn on the power of the machine.
OFF
Power switch
OFF
The hot melt glue in the glue tank will be ready for binding in about 30 minutes at earliest after you
turn on the power.
The time for the machine to be ready for a binding operation after turning on the power
varies depending on the hot melt glue you are using and the environment.
2.
Turn the panel angle adjustment knob to adjust the angle of the touch panel.
Touch panel
Panel angle
adjustment knob
3.
Tighten the panel angle adjustment knob to fasten the touch panel.
Summary of Contents for DPB-500
Page 15: ...Chapter 1 BEFORE OPERATION...
Page 36: ...1 22 CHAPTER 1 BEFORE OPERATION Memo...
Page 37: ...Chapter 2 PREPARING FOR OPERATION...
Page 59: ...Chapter 3 STARTING BINDING OPERATION...
Page 86: ...3 28 CHAPTER 3 STARTING BINDING OPERATION Memo...
Page 87: ...Chapter 4 FINE ADJUSTMENT AND OPTION SETTING...
Page 116: ...4 30 CHAPTER 4 FINE ADJUSTMENT AND OPTION SETTING Memo...
Page 117: ...Chapter 5 CLEANING THE UNIT...
Page 127: ...Chapter 6 TROUBLESHOOTING GUIDE...
Page 145: ...Chapter 7 APPENDIX...
Page 147: ...7 3 CHAPTER 7 APPENDIX Memo...
Page 148: ...11H 92832 0 09050000D This manual is printed on recycled paper to help protect the environment...