OP000471
4-21
Inspection, Maintenance and Adjustment
Grease Dozer Pins and Dozer Cylinder
A.
Dozer pins (2 points).
B.
Dozer cylinder (2 points).
Grease Boom Swing Cylinder and Bracket
There are four grease fittings for the Boom Swing.
Do not over lubricate, purge oil grease with new. Remove
all purged grease.
A.
Boom swing cylinder head (1 points).
B.
Swing gear (1 points).
C.
Swing bearing (1 points).
D.
Boom swing cylinder rod (1 points).
E.
Boom swing bracket (2 points).
Grease Swing Gear Pinion Teeth
1.
Inject two or three strokes of grease through the
grease fitting (B, Figure 31).
2.
Lift bucket about 20 cm (8 in) from ground. Turn upper
body 90
° at a time for two full turns, greasing the
swing gear pinion teeth at each stop.
Grease Swing Bearing
1.
Inject grease through the three grease fittings (C,
Figure 31) using a grease gun.
2.
Lift bucket about 20 cm (8 in) from ground. Turn upper
body 90
° at a time for one full turn, greasing the swing
bearing at each stop.
NOTE:
If the unit has been running or working in water
the swing bearing should be greased on a 10
hour / daily basis.
Figure 29
B
B
A
A
FG007671
Figure 30
A
B C
FG007678
Figure 31
E
D
E
FG007673
Summary of Contents for DX35Z
Page 2: ......
Page 6: ...Table of Contents K1025196E IV Index 8 1 ...
Page 60: ...OP000468 Safety 1 54 ...
Page 90: ...OP000469 Operating Controls 2 30 ...
Page 132: ...OP000470 Operation 3 42 ...