OP000471
Inspection, Maintenance and Adjustment
4-20
50 HOUR / WEEKLY SERVICE
Perform All Daily Service Checks
Grease Front Attachment Pins
Grease every 10 hours for first 100 hours and every 50
hours thereafter.
NOTE:
If the unit has been running or working in water the
front attachment should be greased on a 10 hour /
daily basis.
•
Position machine as shown below and lower the
front attachment to the ground and shut down
engine
•
Press the grease fitting and inject grease with the
grease gun on the marked point
•
After injection, clean off the old grease that has
been purged.
Figure 28
Reference
Number
Description
A
Boom Cylinder (2 Points)
B
Arm Cylinder (2 Points)
C
Boom and Boom Swing Joint
(1 Points)
D
Boom and Arm Joint (1 Point)
E
Bucket Cylinder (2 Points)
F
Arm link Joint Pin (1 Point)
G
Arm and Bucket Joint (1 Point)
H
Link Joint (3 Point)
Reference
Number
Description
FG007675
C
B
B
A
A
D
H
E
G
F
E
Summary of Contents for DX35Z
Page 2: ......
Page 6: ...Table of Contents K1025196E IV Index 8 1 ...
Page 60: ...OP000468 Safety 1 54 ...
Page 90: ...OP000469 Operating Controls 2 30 ...
Page 132: ...OP000470 Operation 3 42 ...