Initialising the device
97
Putting the device into operation
The following description applies to all ENiQ and ELS devices.
The commissioning, initial programming and management of the Access
Manager/Access Manager Terminal and Access Manager ITT with full
functionality can be carried out using the ENiQ Access Management software,
ELS software and/or ELS mobile software. This is described in detail in the
instructions found on the CD of the respective software product or the DOM
home page. The ENiQ app specifies corresponding steps itself and guides you
through the tasks without the need for additional instructions.
You only require the master card to put the DOM devices into operation
(with the exception of the DOM Tapkey). You use this to create affiliation
with the system. You have to undertake this process once. Keep the
master card in a safe place that only authorised people can access. The
master card has no function as a locking medium.
The programming with the master card and/or programming card described
below is always undertaken on the DOM device.
Initialising the device
The DOM devices are ready for operation as soon as the power supply is
connected. The DOM devices have a real time clock which is used to generate
events and manage schedules, among other things. The clock will continue to
run correctly for up to 48 hours in the event of a power outage. A prerequisite
for this is that the DOM device has been permanently supplied with power for
at least 5 hours prior to the power outage. Check date and time following a
power outage. This is only relevant if you manage the product with an app or
software.
ATTENTION!
The control unit will be unable to recognise the passive
reader if the control unit is connected to the power supply
before the passive reader.
First of all, connect the passive reader to the power supply.
Establish the power supply by connecting the power supply unit or by
inserting the plug for PoE (Power over Ethernet) into the corresponding
socket.
First establish the power supply for the passive reader. Wait for the start
process to complete.
Then establish the power supply connection for the control unit.