Starting
Move at least 3m (10ft) away from the place of refuelling. Place the brushcutter on a clean piece of ground taking care that the cutting tool does
not come into contact with the ground or any other objects.
First place the machine on the ground.
–
Give a gentle push on the primer pump (4) repeatedly (7-10 times) until fuel
–
comes into the primer pump.
Move the choke lever (5) to the top position (
–
).
Firmly hold the unit by your left hand, as illustrated.
–
Slowly pull the starter grip until resistance is felt and continue with a smart pull.
–
Do not pull out the starter rope to its full extent and do not allow the starter handle
–
to be retracted without control, but ensure that it is retracted slowly.
Repeat the starting operation until initial ignitions are heard.
–
Depress the choke lever (
–
) and pull the starter rope again until the engine
starts.
As soon as the engine starts, immediately tap and release the throttle, thus
–
releasing the half-throttle lock so that the engine can run in idle.
Run the engine for approximately one minute at a moderate speed before
–
applying full throttle.
Caution during operation:
If the throttle lever is opened fully in a no-load operation, the engine rotation is increased to 10,000 min
-1
or more. Never operate the engine at a
higher speed than required and at an approximate speed of 6,000 - 8,000 min
-1
.
Cold start
Grasp the handle (hand pressure activates the safety lock-off lever (1)).
–
Press the throttle lever (2) and hold it down.
–
Push the I-O switch (3) to START.
–
PUTTING INTO OPERATION
Observe the applicable accident prevention regulations!
15
Summary of Contents for MS-4215
Page 170: ...DOLMAR DOLMAR DOLMAR 170 171 175 176 177 177 178 180 181 182 183 184 188 189 170...
Page 171: ...1 3 2 4 5 6 15m 50FT 360 171 15 18 16 1 5 2 3 4 5 6 15 50...
Page 172: ...3 10 172 3...
Page 173: ...12 2 173 10 20 12 2 3 cm 8 11 12 2 11 12 2 5...
Page 177: ...M6 x 20 1 2 1 2 3 4 5 MS 4215 1 4 2 3 4 1 5 177...
Page 178: ...MS 4215 1 1 DOLMAR 255 mm 10 305 mm 12 178...
Page 179: ...1 2 3 3 4 3 2 1 2 3 4 3 4 3 4 4 4 3 4 179...
Page 180: ...4 3 2 1 4 4 1 1 2 3 4 3 2 1 20 30 N m 3 2 1 4 4 180...
Page 182: ...1 II II 2 1 2 182 III 1 1...
Page 183: ...3 1 2 4 5 3 m 10ft 4 7 10 5 10 000 min 1 6 000 8 000 min 1 1 2 I O 3 START 183...
Page 184: ...2 600 min 1 1 2 1 STOP 2 2 1 1 2 184...
Page 185: ...6 000 min 1 2 80 mm LH 100 mm 80 mm 100 mm 185...
Page 186: ...1 2 3 186...
Page 187: ...4 LH 5 100 mm 3 15 16 6 7 8 LH 100 mm 187...
Page 189: ...ON OFF 189...
Page 190: ...1 3 I O STOP I O OPERATION 7 10 1 190...
Page 212: ...DOLMAR GmbH Postfach 70 04 20 D 22004 Hamburg Germany http www dolmar com 885333 937 ALA...