42
Operating instructions
•
DINO 160XTB
•
180XTB
•
210XTB
When leaving the lift
• drive the lift to a safe position, preferably to the transport position
• switch off the power unit
• prevent unauthorized use of the lift by locking the control centre cover
5.2.3. Special instructions for winter use
The lowest allowed operating temperature of the lift is -20 °C
In cold conditions do the following special actions in addition to normal start-up procedure.
1. if the temperature is below zero, let the power unit run for a few minutes before starting
the movements
2. start with a few movements to warm-up oil in the cylinders and to ensure proper operation
of the valves
3. check that the limit switches and the emergency descent devices are operational and
clean (from dirt, snow, ice, etc.)
4. protect the control panel and the platform from snow and ice whenever they are not in
use
5. Make sure the batteries are charged. Flat batteries freeze easily.
Always keep the lift free from dirt, snow etc
.
5.2.4. Measures to be taken at the end of the working day
At the end of a workday:
1. Retract the telescope boom completely.
2. Check that the platform is perpendicular to the boom.
3. Lower the boom/platform onto the support on the chassis.
The limit switch on the transport support prevents operation of the support outriggers if
the platform is not down
4. Close the cover on the platform control panel.
5. Turn the key switch to OFF-position and turn off the main switch .
6. If you want to recharge the battery, leave the mains cable connected; otherwise
disconnect the lift from the mains supply.
7. Make sure that the covers are locked.
DANGER
WARNING
CAUTION
NOTICE
With respect to the operation and durability of the batteries, it is beneficial to connect them
for recharging at the end of each workday, irrespective of their remaining level of charge.
Keeping the batteries in storage without charging them first shortens their service life and
flat batteries also freeze easily.
Summary of Contents for DINO 210XTB II
Page 2: ......
Page 9: ...9 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Page 10: ...10 Operating instructions DINO 160XTB 180XTB 210XTB 2 1 2 180 XTB II...
Page 11: ...11 2 1 3 210 XTB II...
Page 52: ...52 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Page 53: ...53 NOTES...
Page 57: ...57 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13...
Page 61: ...61 BLANK...
Page 64: ...64 Operating instructions DINO 160XTB 180XTB 210XTB BLANK...
Page 66: ...66 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Page 67: ...67 NOTES...