Dinamica Generale AgriNIR Operator'S Manual Download Page 1

Summary of Contents for AgriNIR

Page 1: ......

Page 2: ......

Page 3: ...ased on multivariate analysis the AgriNIR is able to provide predictions on actual nutrients of the sample in a real time This instrument structure is composed by a microcomputer that manages the data...

Page 4: ...y other than to resell the Purchased Product to another entity for the purpose of that entity assembling the Licensed Product ii Customer agrees that it will use the Licensed Product only as expressly...

Page 5: ...fee that was included in the amount invoiced to the Customer for the sale of the Purchased Product 8 Entire Agreement Except as expressly stated herein to the contrary this Agreement constitutes the e...

Page 6: ...bottom of the case device from being broken or wrongly hurt To fasten the accessories fodder box accessories for the fodder box power supplier supply cable supply cable with plug for car lighter clear...

Page 7: ...car lighter disconnect this cable when the vehicle s battery is being charged If it is not the case is not responsible for damages to people or to the AgriNIR 6 Disconnect the supply cable from the d...

Page 8: ...NIR analyzer internal system 25 6 6 Initial Optical Checking of the AgriNIR system 27 6 7 Analysis Samples Identifying 31 6 8 Analysis Execution with AgriNIR System 34 6 9 Case of incorrect analysis 3...

Page 9: ...t page 0 40 C Power 12 18 VDC 60W max Display LCD monochromatic VGA Dimensions 50 x 31 x 46 cm Weight 20 Kg Box ABS plastic Protection Grade n a GMS GPRS internal modem only cod 999 0347 Quad Band GSM...

Page 10: ...nalysis value that you can obtain by chemical analysis on the material in question Please see below the specific AgriNIR Accuracy values for each NIR family parameters AgriNIR accuracy for DG standard...

Page 11: ...ory Description FODDER BOX Tray with glass for fodder samples and its pressure plate Also it presents special housing for Check Cell PRESSOR The pressor with sponge is used for grains or dry and chopp...

Page 12: ...l acetyl resin for the optics testing of the machine POWER SUPPLY AC input 100 240V 2A 50 60Hz DC output 12V max 8A and AC power cable with SCHUKO plug IEC320 connector Power cable for car lighter plu...

Page 13: ...figuration AgriNIR Analyzer Rev A11 ENGLISH 11 4 ELECTRIC CONNECTIONS 4 1 Supplying AgriNIR with the provided power supply Power Connector Power Supply IN 100 240VAC 2A OUT 12VDC max 8A AgriNIR Analyz...

Page 14: ...Configuration AgriNIR Analyzer Rev A11 12 4 2 Supplying AgriNIR with the power cable for car lighter plug Power cable for car lighter plug Power Connector AgriNIR Analyzer...

Page 15: ...is composed FODDER BOX for inserting the sample to analyze NIR OPTICAL UNIT Knob and security hinge of NIR Unit Communication cable of NIR Unit Printer USB plug for memory pen drive PROG DATA connecto...

Page 16: ...al signals ELECTRONIC UNIT processing and control unit of the AgriNIR system With this unit the operator can start the analysis on the feed components put in the fodder box and get the analysis result...

Page 17: ...IR Families components giving them proper theoretical reference values for the chemical parameters that characterize them after having completed its own set of feed components this is transferred to A...

Page 18: ...y DG standard calibrations package NIR Chemical Parameters Moisture Humidity Starch Crude Protein ADF NDF Ash Crude Fat Ether Extract NIR Families CORN SILAGE YES YES YES YES YES YES YES HAY YES NO YE...

Page 19: ...ng head Read NIR to a too much damaged component to external rests present etc In case of grains calibrations package optional calibrations for grains the portable analysis system AgriNIR can analyze...

Page 20: ...CLEAN without residues of other samples in case of very soft materials with long pieces as hay alfalfa or grass silage it is NECESSARY sampling material using a special Corer strongly suggested and t...

Page 21: ...the fodder profile OK Upper handles are inside the fodder profile NO Upper handles are over the fodder profile creating mechanical interference during the insertion of the fodder inside the AgriNIR bo...

Page 22: ...ar with a uniform speed spending about 2 seconds for a complete scanning cycle 1 sec to front and 1 sec to rear the fodder profile has to be always inside the AgriNIR box OK The fodder box is complete...

Page 23: ...device loads all the settings requested from the customer and previously set After ONLY FOR AgriNIR W a screenshot with an initialization time of 5 minutes appears After all initialization phases the...

Page 24: ...can access to the next 4 function icon if you press you can return to the 6 previous function icon ONLY FOR AgriNIR W NIR status icon Current Date Time List of NIR families available on AgriNIR analyz...

Page 25: ...erences READY the AgriNIR system is ready for the analysis execution RUNNING ANALYSIS the AgriNIR system is executing the analysis CONNECTION MISSING or ERROR STATUS the NIR group is not connected to...

Page 26: ...s execution during the CALIBRATION phase the AgriNIR system shows the following message The status icon of the NIR system indicates the CALIBRATION phase At the end of the calibration this message dis...

Page 27: ...communication and to update NIR status icon and NIR temperature 2 Please check if the communication cable from Electronic Unit front control panel is connected to the NIR group inside the bottom box...

Page 28: ...ature of 32 C Please IMMEDIATELY turn OFF the AgriNIR machine and leave it off for at least 30 minute TROUBLESHOOTING 1 Verify if the environmental temperature where the AgriNIR machine is located is...

Page 29: ...g the CHECK CELL accessory CHECK CELL special sample cell acetyl resin for the optics testing of the AgriNIR machine Follow the procedure below to perform the OPTICAL TEST PROCEDURE 1 Insert the CHECK...

Page 30: ...ide up inside the AgriNIR box until the bottom 3 In the main screen press to access to the next 4 function icon then press to enter on AGRINIR OPTICS TEST procedure the AgriNIR analyzer shows instruct...

Page 31: ...rted 5 After 40 seconds the AgriNIR analyzer shows the optical test result The AgriNIR internal optics is OK Now you can proceed to execute analysis Press ENTER or RESET to exit and continue 6 If the...

Page 32: ...he CHECK CELL glass or the ReadNIR glass is broken otherwise contact the Customer Service for the spare parts 5 Verify if the lamp inside the NIR group is not on its correct position or its time life...

Page 33: ...ID number will be automatically proposed before starting the analysis on the sample and it will be printed on the tickets at the end of analysis execution LAST SAMPLE ID is the previous sample identif...

Page 34: ...CLIENT INFORMATIONs will be stored in the INFO DAT file containing the Client s data when analysis is saved on USB memory key To modify the data in the CLIENT INFORMATION window press keys to move up...

Page 35: ...rs from the cursor position to the end on the right press to insert a character at the end on the right press ENTER to confirm the new data string press RESET to exit without modify the data string pr...

Page 36: ...ressing the keys In case of standard calibrations package the portable analysis system AgriNIR can analyze till to a max of 7 NIR families feed components categories as mentioned at page 13 Moving the...

Page 37: ...e physical sample to be analyzed SAMPLE ID it s the actual number to assign to the physical sample LAST SAMPLE ID it s the previous number assigned to last physical sample analyzed Press the cursor ke...

Page 38: ...fodder box between a single analysis and the next Case of LARGE SAMPLE QUANTITY Examples bunker of Corn Silage Grass Silage or TMR bale of Hay or Alfalfa Hay 1 Collect enough samples that are represe...

Page 39: ...UM 20 ANALYSIS WARNING Please start IMMEDIATELY to move the fodder box as soon as you press ENTER During the execution of the repeated analysis are shown screens like this Here it s indicated the exec...

Page 40: ...ical parameters are the result of the prediction AVERAGES of the single analysis performed In case of analysis not right performed the AgriNIR system does not consider them in the final average of the...

Page 41: ...h Correct Use of the Fodder Box for the Samples to Analyze at page 16 3 Verify if you have chosen the correct NIR family component before start the analysis on the sample 4 Verify the cleaning of the...

Page 42: ...you can set the PRINTOUT NUMBER i e the number of copies of the ticket max 99 copies displaying the current number of printouts in a small box on the bottom of the screen Press the cursor keys or the...

Page 43: ...48 how to set NIR Family Identifier Number Kind of Analyzed Component NIR Family Name Analysis Results of Chemical Parameters on AsIs and on the Dry Matter Time Hour of the Analysis Execution Identif...

Page 44: ...a file folder is created with naming convention Date Time which contains analysis folders on USB key one file txt with naming convention ID NIR Family _ progressive number for each single analysis jus...

Page 45: ...key automatically is PRINTED the number of ticket set previously the following message is shown on the display Machine S N serial number of AgriNIR device used to make the analysis Sample ID identifi...

Page 46: ...t or It s necessary to erase a part of data stored on USB Key 6 12Analysis History available only for AgriNIR W The AgriNIR W save automatically the last 100 analysis executed inside an archive It is...

Page 47: ...Use AgriNIR Analyzer Rev A11 ENGLISH 45 Press the key in order to copy the datas of analysis on the usb memory card Press the key in order to delete the archive relative to the analysis...

Page 48: ...NEXT and PREVIOUS screen B W DISPLAY INVERSION with this command you can invert the display from white background to black background and vice versa CONTRAST ADJUSTMENT with this command you can adjus...

Page 49: ...ystem To update the calibrations 1 insert the USB memory key with the file comp a37 containing the new calibration curves 2 select the ID of the component see component list in the main screen where y...

Page 50: ...ev A11 48 6 14 1 Update Calibrations for AgriNIR W Switch ON the AgriNIR W machine keeping pressed both the buttons until the BOOTLOADER screen appears Press the F5 button to start loading the AgriNIR...

Page 51: ...zer Rev A11 ENGLISH 49 Press the F1 button to continue the AgriNIR W calibration upgrade Wait the calibration loading few seconds until the GREEN SCREEN will appear Press the button to switch OFF the...

Page 52: ...r NIR Data Structure upgrading is necessary to reload the configuration file nirdata bin provided by dinamica generale or created by DGNirManager program Please follow the steps below 1 Copy nirdata b...

Page 53: ...51 4 DO NOT remove the USB memory key while the file is being loaded 5 Verify the new NIR Families list just loaded on the AgriNIR machine 6 Execute an analysis to check the new Chemical Parameters n...

Page 54: ...rong and relevant optical spectra acquired from the analyzed samples Pressing ENTER you start the deleting procedure of the analysis data from the internal memory of the AgriNIR system In this phase a...

Page 55: ...cution Log is reaching its full capacity NOTE This section of internal memory is NOT accessible to the user and may NOT be deleted with the deleting function as this function refers only to the memory...

Page 56: ...em Press ENTER to confirm the deleting procedure of the Analysis Execution Log After a few seconds you get the message informing that the deleting procedure of the Analysis Execution Log was successfu...

Page 57: ...the AgriNIR system with your preferred data To set your Printer Header on the tickets follow this procedure When switching the system on when the message System Initialization is displayed press ENTER...

Page 58: ...ll characters from the cursor position to the end on the right press to insert a character at the end on the right press ENTER to confirm the new data value press RESET to exit without modify the data...

Page 59: ...ecuring bracket of the NIR Group by 90 anticlockwise as shown in pict 6B raise the NIR Group up as shown in pict 6C clean with a soft lightly wet cloth the Read NIR reading head s window and eliminate...

Page 60: ...rom the hole for inserting the fodder box on the right side of the case after 2 minutes the actuator must move the optical calibration door just under the Read NIR reading head s window see sect 6 pic...

Page 61: ...Read NIR reading head s window is clean WARNING The optical fiber is directly connected inside the NIR optical sensor and shows a little glass fiber inside that s why THE NIR GROUP SHOULD NOT BE OPENE...

Page 62: ...re update the internal calibrations of NIR analysis send collected samples to analyze in a laboratory according to the SAMPLES COLLECTION HANDBOOK All the analysis values performed by AgriNIR system a...

Page 63: ...conformity with the following directives and standards required by European 2004 108 EC respecting the following laws EMC generic standard for emission EN 61326 1 EN 55011 1999 A1 2000 A2 2003 EMC ge...

Page 64: ...head office faulty parts due to poor materials or faulty construction provided that such parts are delivered free port supplier s head office Shortcomings and defects due to incorrect use of instrumen...

Page 65: ...our work and according to these beliefs we are at your service providing you with a simple as well as new precise and professional product which is going to make your job easier for many years This u...

Page 66: ......

Page 67: ...ISO 13485 2012 ISO 14001 2004...

Page 68: ...Cod 985 0039 Rev A11...

Reviews: