Chapter 4 Parameters
|
VFD-L-I Series
Revision July 2009, SW V1.1
4-41
Pr.07-05
Pr.07-19
Target
value
setting
*1 or *(-1)
Pr.07-06
0V
10V
1
0
Pr.07-22
Pr.07-22
Pr.07-07
Proportional
gain
Pr.07-09
D
Pr.07-08
I
Pr.07-14
Pr.07-12
Force to 0
Pr.07-21=1
Pr.07-23
Delay for
soft start
error
stop
0: enable
0: enable
2001H
Master
frequency
Pr.07-13
OFFSET
Pr.07-04=2
Pr.07-12
Bit0
Limit
Pr.01-07
Pr.01-08
output
0V
10V
1
0
Pr.07-15
Pr.07-16
Pr.07-06
AVI
Pr.07-17
Pr.07-18
0: enable
Pr.07-17=01, value of the next step will be forced to 0
stop
Pr.07-17=02
+
-
+
+
+
P modulation
Pr.07-10
Pr.07-11
*1 or *(-1)
Pr.07-12
Bit1
+
Pr.07-17=0, value of the next step will be forced to 0
Soft start
PID feedback signal
detection
-10V
outpu
t
input
outpu
t
input
07-05
PID Set Point Selection
Factory Setting: 3
Settings
0
Reserved
1
0 to 10V from AVI
2
Reserved
3
Set
by
Pr.07-19
4
RS-485
communication
interface
07-06
Input Terminal for PID Feedback
Factory Setting: 0
Settings
0
Positive PID feedback from external terminal (AVI) 0 to +10V
1
Reserved
2
Negative PID feedback from external terminal (AVI) 0 to +10V
3
Reserved
Select an input terminal to serve as the PID feedback location. When Pr.07-06 is set to 0 or 2,
Pr.07-05 can’t be set to 1.
Negative feedback = Positive target value – detection value. It is used for the application that
the detection value will be increased by increasing output frequency.
Positive feedback = Negative target value + detection value. It is used for the application that
the detection value will be decreased by increasing output frequency.
07-07
Proportional Gain (P)
Unit: 0.1
Settings
0.0 to 10.0
Factory Setting: 0.2
This parameter is used to determinate error gain. If I = 0 and D = 0, doing proportional gain
operation.
Summary of Contents for VFD-L-I Series
Page 1: ...PLC1 ir...
Page 2: ......
Page 3: ......