Dell PowerConnect B-Series TI24X Hardware Installation Guide
19
53-1002265-01
Verifying proper operation
2
•
Insert the PDU power cords (C13-C14) plug into a properly grounded 115V or 120V electrical
outlet.
FIGURE 7
Attaching the AC PDU power cords (C13-C14)
•
Repeat this procedure for the second power supply.
•
Verify the device is working properly (refer to
Powering off the system
To turn an AC system OFF:
•
Unplug the PDU power cords(C13-C14) from the power source.
Verifying proper operation
After you have installed any additional power supplies and powered on the system, verify that the
device is working properly.
1. Verify that the LEDs on the power supply and system power LED are solid green.
2. Verify proper operation by observing the LEDs on the front panel.
10G port LEDs should be lit while the device performs diagnostics. After the diagnostics are
complete, the LEDs will be dark except for those that are attached by cables to other devices.
If the links on these cables are good and the connected device is powered on, the link LEDs will
light.
provides more details on specific LED conditions after system start-up.
1