Engström Carestation
3-2
08/07 1505-1018-000
3.1 Inspect the system
Before testing the system, ensure that:
•
The equipment is not damaged.
•
Components are correctly attached.
•
Pipeline gas supplies are connected.
•
The casters are not loose and the brakes are set and prevent movement.
•
The power cord is connected to a wall outlet. The mains indicator comes
on when AC Power is connected.
3.2 Automated Checkout
The EC is equipped with an automated checkout.
Note
If any of the Checks fail, refer to Section 7.1, “Troubleshooting Checkout
Failures”, to troubleshoot a specific failure.
To file a quality report or request technical assistance regarding a checkout
failure, create and include a Checkout log using the EC Service application
(Section 8.6.8).
Run the Checkout while the EC Service Application is running and select
LLL
Loo
o
oggg
g
C
C
C
Caa
a
alllliiiibb
b
brrrraa
a
attttiiiioo
o
onn
n
n R
R
R
Reee
essssuu
u
ullllttttssss
.
When in Standby, the
Patient Setup
menu is displayed on the normal screen.
1. Select
Checkout
.
2. Attach the patient circuit.
3. Occlude the patient wye.
4. Select
Start Check
.
•
The results appear next to each check as they are completed. When
the entire checkout is finished ‘Checkout complete’ will appear and
the highlight will move to
Delete Trends
.
•
If one or more checks fail, select
Check Help
for troubleshooting
tips.
Summary of Contents for Engstrom Carestation
Page 1: ...Engström Carestation Technical Reference Manual ...
Page 12: ...Engström Carestation x 08 07 1505 1018 000 ...
Page 52: ...Engström Carestation 2 26 08 07 1505 1018 000 ...
Page 100: ...Engström Carestation 5 26 08 07 1505 1018 000 ...
Page 124: ...Engström Carestation 7 16 08 07 1505 1018 000 ...
Page 188: ...Engström Carestation 8 26 08 07 1505 1018 000 ...