DT9000
12
20171205-V2
Preparatory steps
There are four through-holes, shown by arrows in the
following drawing, for the fastening of the housing. The
diameters of the holes are made for M3 screws.
Holes for mounting
1. Mark the places of the holes in accordance with the
drawing.
2. Make the holes for mounting ready.
3. Remove any burrs from the ready-made holes.
Please observe the safety rules throughout the operation.
Summary of Contents for DT9000
Page 1: ...DT9000 Intrinsically Safe Process Indicator Operating Instructions...
Page 65: ...DT9000 20171205 V2 65 10 2 Application example...
Page 85: ...DT9000 20171205 V2 85 10 9 ATEX Certification...
Page 86: ...DT9000 86 20171205 V2...
Page 87: ...DT9000 20171205 V2 87...
Page 88: ...DT9000 88 20171205 V2...
Page 89: ...DT9000 20171205 V2 89...
Page 90: ...DT9000 90 20171205 V2...
Page 91: ...DT9000 20171205 V2 91...
Page 92: ...DT9000 92 20171205 V2...
Page 93: ...DT9000 20171205 V2 93...
Page 94: ...DT9000 94 20171205 V2...
Page 95: ...DT9000 20171205 V2 95...
Page 96: ......