![Datcon DT9000 Operating Instructions Manual Download Page 15](http://html1.mh-extra.com/html/datcon/dt9000/dt9000_operating-instructions-manual_3742647015.webp)
DT9000
20171205-V2
15
Mounting by the
screw clamps
2. Put on the enclosed seal onto the instrument case from
the rear side and fit it to the instrument holding frame
(Figure step 2).
3. Put the instrument into the prepared cut-out until it
possible and check the fitting of the seal between case and
mounting surface.
4. Put on the enclosed screw clamps onto the sides of the
instrument case (Figure step 4.1, 4.2).
Fix the instrument by turning the srews in clockwise
direction (Figure step 4.3).
Pay attention not to let pointed, sharp metal parts cause
accidents.
Summary of Contents for DT9000
Page 1: ...DT9000 Intrinsically Safe Process Indicator Operating Instructions...
Page 65: ...DT9000 20171205 V2 65 10 2 Application example...
Page 85: ...DT9000 20171205 V2 85 10 9 ATEX Certification...
Page 86: ...DT9000 86 20171205 V2...
Page 87: ...DT9000 20171205 V2 87...
Page 88: ...DT9000 88 20171205 V2...
Page 89: ...DT9000 20171205 V2 89...
Page 90: ...DT9000 90 20171205 V2...
Page 91: ...DT9000 20171205 V2 91...
Page 92: ...DT9000 92 20171205 V2...
Page 93: ...DT9000 20171205 V2 93...
Page 94: ...DT9000 94 20171205 V2...
Page 95: ...DT9000 20171205 V2 95...
Page 96: ......