Test Operation
SiBE37-701
160
Test Operation
Note:
After knocking out the holes, we recommend you remove burrs in the knock holes
(See
above figure)
and paint the edges and areas around the edges using the repair paint.
1.2.5 Additional Refrigerant Charge and Check Operation
The outdoor unit is charged with refrigerant when shipped from the factory, but depending on
the size and length of the piping when installed, it may require additional charging.
For charging the additional refrigerant, follow the procedure in this chapter.
And then carry out the check operation.
1.2.5.1
Before Working
[About the refrigerant cylinder]
Check whether the cylinder has a siphon pipe before charging and place the cylinder so that the
refrigerant is charged in liquid form. (See the figure below.)
Note:
Always use the proper refrigerant (R-410A). If charged with the refrigerant containing an
improper material, it may cause an explosion or accident.
R-410A is a mixed refrigerant, so charging it as a gas will cause the refrigerant composition
to change, which may prevent normal operation.
Caulking, etc.
Insulation material
Piping lead-out hole lid
Block “ ”.
Open a knock hole at “ ”.
Note: Total amount of refrigerant should be 100kg or less
With siphon pipe
Other tanks
Stand the cylinder upright and charge.
(The siphon pipe goes all the way inside,
so the cylinder does not need be put
upside-down charge in liquid form.)
Stand the cylinder upside-down and charge.
Summary of Contents for VRV III REYQ8PY1B
Page 1: ...REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701...
Page 111: ...Refrigerant Flow for Each Operation Mode SiBE37 701 100 Refrigerant Circuit...
Page 252: ...SiBE37 701 Troubleshooting by Remote Controller Troubleshooting 241...
Page 396: ...SiBE37 701 Piping Diagrams Appendix 385 REYQ14P 16P 3D058153B S2NPL S1NPH...
Page 397: ...Piping Diagrams SiBE37 701 386 Appendix REMQ8P 3D057743...
Page 398: ...SiBE37 701 Piping Diagrams Appendix 387 REMQ10P 12P 3D057742...
Page 399: ...Piping Diagrams SiBE37 701 388 Appendix REMQ14P 16P 3D057741...
Page 400: ...SiBE37 701 Piping Diagrams Appendix 389 1 2 Indoor Unit FXFQ P...
Page 405: ...Piping Diagrams SiBE37 701 394 Appendix 1 3 BS Unit 4D057985A...
Page 415: ...Wiring Diagrams for Reference SiBE37 701 404 Appendix FXZQ20M 25M 32M 40M 50MV1...
Page 416: ...SiBE37 701 Wiring Diagrams for Reference Appendix 405 FXCQ20M 25M 32M 63MV3...
Page 417: ...Wiring Diagrams for Reference SiBE37 701 406 Appendix FXCQ40M 50M 80M 125MV3...
Page 420: ...SiBE37 701 Wiring Diagrams for Reference Appendix 409 FXDQ20M 25MV3...
Page 421: ...Wiring Diagrams for Reference SiBE37 701 410 Appendix FXSQ20M 25M 32M 40M 50M 63MV3...
Page 422: ...SiBE37 701 Wiring Diagrams for Reference Appendix 411 FXSQ80M 100M 125MV3...
Page 447: ...Example of connection SiBE37 701 436 Appendix...
Page 453: ...Method of Checking the Inverter s Power Transistors and Diode Modules SiBE37 701 442 Appendix...
Page 467: ...SiBE37 701 iv Index...