![background image](http://html1.mh-extra.com/html/daikin/ftks20d3vmw/ftks20d3vmw_service-manual_4060508314.webp)
SiENBE12-713
Outdoor Unit
Removal Procedure
303
8
Names of parts on the
control PCB.
"
See page 56 for detail.
9
Loosen the 2 screws of
the radiation fin.
10
Loosen the 3 screws of
the reactor and the 1
screw of the clamp.
Step
Procedure
Points
Fuse (FU3)
3.15A 250V
(S70)
(S40) (S20) (S21)
(S22)
(S80)
(S101)
(S15)
(S10)
Fuse (FU1)
30A 250V
Fuse (FU2)
3.15A 250V
(S51)
R
a
di
a
tion fin
Cl
a
mp
Re
a
ctor
Summary of Contents for FTKS20D3VMW
Page 11: ...Introduction SiENBE12 713 x...
Page 47: ...Specifications SiENBE12 713 36 Specifications...
Page 113: ...Control Specification SiENBE12 713 102 Function and Control...
Page 235: ...Instruction SiENBE12 713 224 System Configuration...
Page 297: ...Check SiENBE12 713 286 Service Diagnosis...
Page 316: ...SiENBE12 713 Outdoor Unit Removal Procedure 305 Step Procedure Points...