Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–53
3
5
1
5
1.12.6 Removal of Switch Box
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
Remove decoration panel
first.
1
Remove the lid of switch
box.
(Two pieces of M4
screws)
2
Disconnect the
connection wires for
outdoor units and earth
wire. At this time, cut the
tie wrap fixing the
connection wires.
Disconnect wire of
remote controller also. At
this time, cut the tie wrap
fixing the wire of remote
controller.
(S2650)
(S2651)
Fixing
screw
(M4×12)
Fixing
screw
(M5×12)
Fixing screw
(M4×12)
Wires for remote controller
Tie wrap
Tie wrap
Outdoor unit
connection wire
and earth wire
Outdoor unit
connection
wire terminal
P1 P2 F1 F2
X17A
X18A
X25A
X20A
Capacitor
for fan
X15A
Summary of Contents for FCQ35B7V1
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...