![background image](http://html2.mh-extra.com/html/daikin/fcq35b7v1/fcq35b7v1_service-manual_4700521350.webp)
Disassembly and Maintenance
ESIE05-04
5–100
Part 5 – Disassembly and Maintenance
3
1
5
5
1.14.4 Removal of Fan Motor
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Removing fan motor
a. Disconnect connector.
b. Remove lead wire
retaining plate.
Caution:
Fan motor can be removed
without removing the lead wire
retaining plate.
However, when washing the heat
exchanger, this plate should be
removed and protect the lead
wires.
2
Remove screws for
mounting fan motor.
Q
FUQ71BUV1B:
Three screws
Q
FUQ100/125BUV1B:
Four screws
Summary of Contents for FCQ35B7V1
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...