![background image](http://html2.mh-extra.com/html/daikin/fcq35b7v1/fcq35b7v1_service-manual_4700521318.webp)
Disassembly and Maintenance
ESIE05-04
5–68
Part 5 – Disassembly and Maintenance
3
1
5
5
3
Install the heat
exchanger mounting
plate.
4
Insert two thermistors.
Then cover the header by
anti sweat tube.
Q
Set the lead wire with yellow
tape (for heating) upper side
while that with no tape (for
liquid) lower side.
5
Reinstall the lead wire of
thermistor and anti sweat
tube on the original
position by using two
pieces of heat resistance
tie wrap.
∗
Heat resistance tie wrap
Parts No.:1278921
(Drg No.:4SA90202-1)
Step
Procedure
Points
Heat exchanger
mounting plate
(S2681)
(S2682)
Anti sweat tube
(S2673)
Anti sweat tube
Summary of Contents for FCQ35B7V1
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...