ESIE05-04
Pre-Test Run Checks
Part 4 – Commissioning and Test Run
4–7
3
4
5
1
3
Press the UP and DOWN buttons to set the address. Set the same address as the
receiver (1, 2 or 3). The receiver does not work with addresses 4, 5 and 6.
4
Press the RESERVE button to confirm the setting.
Step
Action
UP
DOWN
RESERVE
Summary of Contents for FCQ35B7V1
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...