![background image](http://html.mh-extra.com/html/daikin/altherma-ekhbh-series/altherma-ekhbh-series_service-manual_501281136.webp)
Additional Checks for Troubleshooting
ESIE06-03
3–50
3
1
3
4
5
5.2
Fan Motor Connector Output Check
Check No.01
1
Check connector connection.
2
Check motor power supply voltage output (pins 4-7).
3
Check motor control voltage (pins 4-3).
4
Check rotation command voltage output (pins 4-2).
5
Check rotation pulse input (pins 4-1)
.
7
6
5
4
3
2
1
Motor power supply voltage
Unused
Unused
P.0V (reference potential)
Motor control voltage (15 VDC)
Rotation command voltage (1~ 6 VDC)
Rotation pulse input
S1
Summary of Contents for Altherma EKHBH Series
Page 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Page 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Page 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Page 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Page 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Page 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...