![background image](http://html.mh-extra.com/html/daikin/altherma-ekhbh-series/altherma-ekhbh-series_service-manual_501281078.webp)
Outdoor Unit Functional Concept
ESIE06-03
2–20
Part 2 – Functional Description
3
1
2
4
5
3.8
Fan Control
Outline
Fan control is carried out according to the following priority:
P
Fan ON control for electric component cooling fan
P
Fan control when defrosting
P
Fan OFF delay when stopped
P
Fan control for maintaining pressure difference
P
Fan control when the compressor starts for heating
P
Fan control in forced operation
P
Fan control in powerful mode
P
Fan control in low noise operation
P
Fan control in silent mode
Fan OFF control
when stopped
Fan OFF delay for 60 seconds must be made when the compressor is stopped.
Summary of Contents for Altherma EKHBH Series
Page 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Page 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Page 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Page 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Page 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Page 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...