![Cranesmart Systems LMI System User Manual Download Page 4](http://html1.mh-extra.com/html/cranesmart-systems/lmi-system/lmi-system_user-manual_2679281004.webp)
3
Cranesmart LMI Version R9
Important Safety Information
All of
Cranesmart™ Systems‟ load cells and support hardware have been designed and tested to have a minimum 5 to 1
safety factor and to meet or exceed the guidelines, standards and certification requirements set forth by more than 30
legislative bodies world-wide including API, ABS, DNV, ASME and OSHA.
All
Cranesmart™ load cells and support hardware are to be considered “Critical Path“components. Loads imposed on
these components should never exceed the maximum rated capacity shown on the load cell(s)/components. The rated
capacity applies only to uniform direct tension loading (straight-line pull). Off-axis loading, bending, side loading, two-
blocking and shock loads should be avoided. Damages caused by such situations are not covered by our warranty.
Inspection for damage, deterioration, cracks and corrosion on all load-bearing components should be conducted pre-
use, weekly, monthly, quarterly or annually, depending upon crane usage. Load bearing components showing damage,
deterioration, cracks or corrosion should be removed from service. If the crane is two-blocked or side loaded the load
cell and links should be visually inspected immediately. Continued use of damaged components may result in
catastrophic failure and personal injury.
Unless authorized by the factory in writing, modifications such as cutting, welding or permanently attaching other
material to any load cell, pin, link or part-thereof will void the warranty.
Do not
repair, alter, rework, or reshape any load
bearing component by welding, heating, grinding or bending.
Do not
engrave or stamp markings into the steel body of
the load cell as this may affect the integrity of the load cell, will void the warranty, and may result in a costly replacement
of the steel body.
Regular Inspections
We recommend that all load components regularly undergo routine visual inspection as noted above. We also
recommend that a qualified inspector, using industry standard techniques such as Ultrasonic Testing and/or Dye
Penetrate Testing, annually inspect the load components. These tests are to be performed in conjunction with the
inspection frequencies and guidelines as mandated by your applicable regulatory bodies.
IMPORTANT NOTE
: Do not disassemble the load cell by removing the plastic covers during testing. Disassembly will
require the cell to be returned to the factory for re-calibration and testing.
If
ANY
issues are found please note the
Cranesmart™ System serial number, contact our staff at 888-562-3222 or 780-
437-2986 and ask for the service department.
Summary of Contents for LMI System
Page 1: ...Cranesmart Systems LMI System User Manual May 11 2015 Rev 9...
Page 23: ...22 Cranesmart LMI Version R9...
Page 43: ...42 Cranesmart LMI Version R9 Basic Wiring Diagram...
Page 45: ...44 Cranesmart LMI Version R9 Junction Box Wiring Diagram...
Page 47: ...46 Cranesmart LMI Version R9 Alarm Hub Wiring Diagram...
Page 91: ...90 Cranesmart LMI Version R9 Technical Specifications 7 500lb single line pull load cell...
Page 92: ...91 Cranesmart LMI Version R9 15 000 single line pull load cell...
Page 93: ...92 Cranesmart LMI Version R9 25 000lb single line pull load cell...
Page 94: ...93 Cranesmart LMI Version R9 40 000lb single line pull load cell...
Page 95: ...94 Cranesmart LMI Version R9 50 000lb single line pull load cell...
Page 96: ...95 Cranesmart LMI Version R9 80 000lb single line pull load cell...
Page 97: ...96 Cranesmart LMI Version R9 Anti 2 Block Switch...
Page 98: ...97 Cranesmart LMI Version R9 Boom Angle Transducer...
Page 99: ...98 Cranesmart LMI Version R9 Display Panel...
Page 100: ...99 Cranesmart LMI Version R9 Alarm Hub...
Page 101: ...100 Cranesmart LMI Version R9 Wind Speed Transducer...