Responsibility of the Manufacturer
Responsibility of the Manufacturer
Covidien is responsible for the safety, reliability, and performance of the energy platform
only if all of the following conditions have been met:
•
Installation and setup procedures in this manual are followed.
•
Assembly, operation, readjustments, modifications, or repairs are carried out by
persons authorized by Covidien.
•
The electrical installation of the relevant room complies with local codes and regulatory
requirements, such as IEC and BSI.
•
The equipment is used in accordance with the Covidien instructions for use.
For warranty information, refer to the
Routine Maintenance and Periodic Safety Checks
When should the energy platform be checked or serviced?
Covidien recommends that the energy platform be inspected by qualified service
personnel at least once a year. This inspection should include adjusting the system to
factory specifications.
When should the power cord be checked or replaced?
Check the power cord before each use of the system or at the intervals recommended by
your institution. Check the power cord for exposed wires, cracks, frayed edges, or a
damaged connector. Replace damaged cords.
When should the fuses be replaced?
An internal component malfunction can damage the fuses. The system fuses may need to
be replaced if the system fails the power-on self-test or if the system stops functioning,
even though it is receiving power from a wall outlet.
Notice
Refer to the energy platform service manual for maintenance recommendations and function and
output-power verification procedures.