Cleaning and Maintenance
8-6
Operator's Manual
•
To preserve the internal dual battery system life:
–
Whenever possible, plug into external power source to charge the batteries.
–
Use the optional DC auto lighter cable accessory to power the ventilator when traveling by auto-
mobile or to connect to an external battery.
for more information on the proper operation of the internal dual battery
system.
8.7.2
6-Month Maintenance
•
Routine maintenance as described in
on page
•
Perform the quick check procedure (reference
)
8.7.3
12-Month Maintenance
•
Routine maintenance as described in
on page
•
Perform the quick check procedure (reference
)
8.7.4
24-Month Maintenance
•
Replace air intake and prox inline filter
•
Replace the primary integrated battery (Power Pac)
•
Replace the secondary internal backup battery
•
Replace the coin battery
•
Replace the oxygen sensor (if installed)
•
Replace the cooling fan filter
•
Perform calibration and OVP (to be done by authorized service provider only)
8.7.5
15 000-Hour Maintenance (or Every 4 Years)
A comprehensive maintenance should be performed after 15000 hours of operation or every 4
years, whichever comes first. Refer to the service manual, or contact Covidien Technical Services
for detailed information on the 15 000-hour maintenance.
Do not attempt to open or perform any service procedures on the ventilator. Only Covidien-
trained technicians are authorized to service the ventilator. Reference
page
Summary of Contents for Newport HT70
Page 1: ...Operator s Manual Newport HT70 Ventilator with Accessories Plus Model TM...
Page 8: ...Page Left Intentionally Blank viii Operator s Manual...
Page 12: ...Page Left Intentionally Blank xii Operator s Manual...
Page 24: ...Introduction Page Left Intentionally Blank 1 12 Operator s Manual...
Page 72: ...Navigating the Screens Page Left Intentionally Blank 4 24 Operator s Manual...
Page 88: ...Operating the Ventilator Page Left Intentionally Blank 5 16 Operator s Manual...
Page 100: ...Ventilator Alarms Page Left Intentionally Blank 6 12 Operator s Manual...
Page 108: ...Battery Operation Page Left Intentionally Blank 7 8 Operator s Manual...
Page 138: ...Explanation of Modes and Controls Page Left Intentionally Blank 10 6 Operator s Manual...
Page 140: ...Quick Check Procedure Check Off Page Left Intentionally Blank A 2 Operator s Manual...
Page 142: ...Foldout Drawings B 2 Page left intentionally blank...
Page 144: ...Foldout Drawings B 4 Page left intentionally blank...
Page 146: ...Foldout Drawings B 6 Page left intentionally blank...
Page 147: ......