A-1
A Quick Check Procedure Check-Off
Preparation for Use Tests (indicate result for each test)
The Newport™ HT70 Ventilator is ready for operation when all tests have been success-
fully completed.
Note any comments on inspection of unit, corrective action taken, or recommendations for
further action.
Item
Pass
Fail
1. Circuit check procedure
2. No External Power alarm check
3a. Alarms and indicators check: High
1
P alarm
3b. Alarms and indicators check: Low
3
P alarm
4. Pressure gauge/PEEP check
5. Volume/minute volume/respiratory rate check
6. Power
P
ac battery pack and backup battery check
7. Brightness check
Completed by
Date
Unit hours
Facility
Unit serial number
Summary of Contents for Newport HT70
Page 1: ...Operator s Manual Newport HT70 Ventilator with Accessories Plus Model TM...
Page 8: ...Page Left Intentionally Blank viii Operator s Manual...
Page 12: ...Page Left Intentionally Blank xii Operator s Manual...
Page 24: ...Introduction Page Left Intentionally Blank 1 12 Operator s Manual...
Page 72: ...Navigating the Screens Page Left Intentionally Blank 4 24 Operator s Manual...
Page 88: ...Operating the Ventilator Page Left Intentionally Blank 5 16 Operator s Manual...
Page 100: ...Ventilator Alarms Page Left Intentionally Blank 6 12 Operator s Manual...
Page 108: ...Battery Operation Page Left Intentionally Blank 7 8 Operator s Manual...
Page 138: ...Explanation of Modes and Controls Page Left Intentionally Blank 10 6 Operator s Manual...
Page 140: ...Quick Check Procedure Check Off Page Left Intentionally Blank A 2 Operator s Manual...
Page 142: ...Foldout Drawings B 2 Page left intentionally blank...
Page 144: ...Foldout Drawings B 4 Page left intentionally blank...
Page 146: ...Foldout Drawings B 6 Page left intentionally blank...
Page 147: ......