5-1
5 Operating the Ventilator
5.1
Quick Check Procedure
This procedure is intended to assist qualified operators to establish a routine program for veri-
fying proper operation of the Newport™ HT70 Ventilator. Perform this quick check procedure
each time the ventilator is prepared for new patient use. The quick check procedure should be
performed every 6 months as part of the routine maintenance procedure to confirm proper
ventilator operation.
HOMECARE PROVIDERS: This procedure should be performed prior to delivery of the ventilator
to a patient’s home.
Use a copy of the Quick Check Procedure Check-Off Sheet to record the results of each check.
Reference
Quick Check Procedure Check-Off
.
WARNING:
Do not use the Newport HT70 Ventilator if it fails the quick check procedure.
Note:
If Power Save is on, the screen will go to sleep (go blank) when not used for 2 minutes. Just touch the
screen anywhere to bring it back into view.
5.1.1
Equipment Needed
•
1 liter test lung with resistor (LNG800P)
•
Patient breathing circuit with exhalation valve
5.1.2
Pre-Test Inspection
To perform the pre-test inspection:
1.
Inspect the air intake filter through the filter cover on the right side of the ventilator. Replace the filter
if it is dirty. Reference
on page
.
2.
Examine the test lung and patient circuit to ensure that there are no holes that will cause leaks.
3.
Verify that the AC power supply is in good condition.
Summary of Contents for Newport HT70
Page 1: ...Operator s Manual Newport HT70 Ventilator with Accessories Plus Model TM...
Page 8: ...Page Left Intentionally Blank viii Operator s Manual...
Page 12: ...Page Left Intentionally Blank xii Operator s Manual...
Page 24: ...Introduction Page Left Intentionally Blank 1 12 Operator s Manual...
Page 72: ...Navigating the Screens Page Left Intentionally Blank 4 24 Operator s Manual...
Page 88: ...Operating the Ventilator Page Left Intentionally Blank 5 16 Operator s Manual...
Page 100: ...Ventilator Alarms Page Left Intentionally Blank 6 12 Operator s Manual...
Page 108: ...Battery Operation Page Left Intentionally Blank 7 8 Operator s Manual...
Page 138: ...Explanation of Modes and Controls Page Left Intentionally Blank 10 6 Operator s Manual...
Page 140: ...Quick Check Procedure Check Off Page Left Intentionally Blank A 2 Operator s Manual...
Page 142: ...Foldout Drawings B 2 Page left intentionally blank...
Page 144: ...Foldout Drawings B 4 Page left intentionally blank...
Page 146: ...Foldout Drawings B 6 Page left intentionally blank...
Page 147: ......