CEAG Notlichtsysteme GmbH
14
Construction and Function
Assembly and Operating Instructions
Automatic Test System AT-S
+
with STAR
+
Technology
4.
Construction and Function
4.1 Example of Control Cabinet-Construction (AT-S
+
C30)
Cable infeed from above
Triple deck tension spring
installation terminal
with neutral wire dis-
connect terminal
Control unit CU S
+
DC/DC converter.2
AC module
Fuse circuit breaker D02
25 A per field
Fuse circuit breaker NH 00
Cable infeed from below
Lütze mounting system
Circuit switching modules
30 x SU-S
+
2 x 6 A
6-fold mains distribution box
D02 16 A
Summary of Contents for Ceag AT-S+ C0
Page 76: ...400 71 860 177 XXX 07 12 WK...