CEAG Notlichtsysteme GmbH
39
Installation
Assembly and Operating Instructions
Automatic Test System AT-S
+
with STAR
+
Technology
6.6.2 TLS-Bus-Module
If possible these modules should be installed direct in the sub-distribution boards which supply the associated
circuits (for the general lighting or stairwell lighting).
They can be mounted in the AT-S
+
. Otherwise the same criteria for selecting the installation position apply as for
the DLS/3Ph bus modules.
You will find the block connection diagram and further technical information on page 24!
Terminal assignment on the TLS bus module (top/bottom)
X = terminal not assigned
The supply for the glow lamps in the light pushbuttons is connected to
the upper terminal strip on the module, terminals N (O) and L (U); the
PE terminal is also connected to the PE terminal of the SU or SOU!
6.6.3 CEAG 3-phase monitors with 24V current loop
The connection in the AT-S
+
control cabinet is made at the 3-tier terminal block (S3 and S4) for external connections.
Schematic of a CEAG 3-phase monitor with a 24V
control loop for emergency lighting request with
differential loop monitoring for short circuit and
open circuit detection
Schematic showing the connection of several
CEAG 3-phase monitors
NOTES:
Where several sub-distribution boards must be monitored, additional devices must be connected and wired
with the other devices in a 24V loop.
If a 3-phase monitor is to monitor fewer than 3 phases, then the other inputs on the monitor must be jumpe-
red.
CEAG 3-phase monitor
Summary of Contents for Ceag AT-S+ C0
Page 76: ...400 71 860 177 XXX 07 12 WK...