2-18
Compaq ProLiant 8500 Servers Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer:
Rick Chew
Project:
Compaq ProLiant 8500 Servers Setup and Installation Guide
Comments:
Part Number:
323333-001
File Name:
c-ch2 Server Installation.doc
Last Saved On:
5/5/99 10:01 AM
Inserting Cage Nuts into the Rack Frame
The cage nuts fit inside the rails at the marked locations.
1.
Use the cage nut fitting tool to insert a cage nut into the rails. Squeeze
the prongs together
1
and insert the cage nut into the appropriate hole in
the rack
2
.
2
1
1
Figure 2-12. Inserting cage nuts
2.
Repeat for each cage nut in front and rear of rack.
3.
Place the template on the back of the rack to mark the location for the
two cage nuts. Also mark where the top of the template is on the rack.
This helps align the next components.