Server Installation
2-7
Compaq Confidential – Need to Know Required
Writer:
Rick Chew
Project:
Compaq ProLiant 8500 Servers Setup and Installation Guide
Comments:
Part Number:
323333-001
File Name:
c-ch2 Server Installation.doc
Last Saved On:
5/5/99 10:01 AM
Unpacking the Shipping Boxes
Unpack the shipping boxes by following the instructions and illustrations
printed on the outside of the boxes. Locate the following materials:
■
ProLiant 8500 Server - located inside shipping box
■
Power cord(s) - located inside country kit box
■
Documentation inside the server (Most of the option installation and
setup instructions are located on hood labels on top of the unit and on
the sides of the Processor and Memory module.)
■
Hardware documentation and software packs inside the country kit:
Server Setup and Management, Reference Information, and Software
Products
In addition to these supplied items, you may need:
■
T-15 Torx screwdriver
■
Options to be installed such as expansion boards, monitors,
uninterruptible power supply (UPS), power supplies, hard drives, hard-
drive cages, tape drives, processors and their power modules, or
memory
■
Application software
■
Cage nut fitting tool
■
Phillips-head screwdriver
■
Flat-head screwdriver
■
Pencil