4-20
Compaq ProLiant 8500 Servers Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer:
Rick Chew
Project:
Compaq ProLiant 8500 Servers Setup and Installation Guide
Comments:
Part Number:
323333-001
File Name:
e-ch4 Installing Hardware.doc
Last Saved On:
5/5/99 10:11 AM
Installing a Hot Plug SCSI Hard Disk Drive
CAUTION:
Before adding or removing any hot-plug SCSI drives, consult your
operating system instructions. Failure to do so could result in loss of data or
damage to equipment.
To install a hot-plug SCSI hard drive:
1.
Remove the blanking panel in an unused drive bay by pushing the side
of the retaining clip inward
, then pulling the blanking panel
outward
.
2
1
Figure 4-18. Removing a hard-drive blanking panel
2.
Push the release button on the left of the new drive and rotate the hot-
plug drive ejector lever outward to unlock.