6-5
Compaq ProLiant 6000 Setup and Installation Guide
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Writer: Sam Ogden Project: Compaq ProLiant 6000 Setup and Installation Guide Comments: 312237-003 (February 1999)
File Name: G-CH06.DOC Last Saved On: 2/4/99 1:26 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
IMD Error Messages
Table 6-1
Error Code Messages
Error Message
Probable Cause
Recommended Solution
LCD Error 01
Indicates a RAM test error
Contact Authorized Compaq
Service Representative
LCD Error 02
Indicates a data bus error
Check the cable connection
LCD Error 03
Indicates a data bus error
Check the cable connection
Configuring the Integrated
Management Display
The Compaq Integrated Management Display can be configured to display a
variety of menus that you can customize to meet your specific needs. This
section provides information on how to configure and customize the Integrated
Management Display.
Setup with the System
Configuration Utility
After installing the hardware, you need to configure the Integrated Management
Display using the System Configuration Utility located on the Compaq
SmartStart and Support Software CD. We recommend that you use this version
of the utility, because it is the latest one that supports your new Integrated
Management Display.
NOTE
: Some operating systems allow online configuration of the IMD. Refer
to the Support Software CD for more information. The Windows NT utility to set
up the IMD is called the Compaq IMD Utility. The NetWare utility is called the
Integrated Management Log Viewer.