28
Revision date: 09.18.14
CLEARSPAN
™
GRO-MAX GOTHIC HIGH TUNNELS
INSTALL THE DROP-DOWN CURTAIN (continued)
9. Locate the 1/8" curtain cord (CC5505) and cut a
section of cord to the length determined in the previous
step.
10. Beginning at one end of the frame, move to the curtain
conduit in the curtain pocket, and make a small cut in
the material
below
the conduit and in line with a pulley.
11. Insert the end of the cord through the opening in the
curtain and tie the cord to the conduit.
12. Take the free end of the cord, thread it through the
pulley,
wrap it over and around the axle conduit,
and
temporarily tie it to the axle conduit.
NOTE:
Verify that the cord is properly aligned with the
pulley and with the other end of the cord tied to the
curtain conduit.
The cord must remain aligned for proper curtain
operation.
13. Drive two (2) FA4482 Tek screws with neo-bonded
washers (102921) into the axle conduit where the
cord is located.
Do not fully seat the Tek screws to the
conduit.
Allow space to remain between the washer
and conduit.
14. Verify that the curtain conduit remains against the
baseboard and pull the slack from the cord.
15. Weave the cord around the Tek screws as shown and
tighten the screws to secure the cord to the axle.
16. Move to the next pulley position and repeat the steps
to measure, cut, and attach another cord to the curtain
and axle conduit.
ATTENTION:
If the cord length was correct for the first,
cut additional cords to the same length. To ensure that
the curtain remains level during operation, verify that
additional cords are wrapped around the axle conduit
in the same direction as the first cord. Continue this
pattern for all remaining cord-to-axle connections.
Cord
Conduit in
Curtain Pocket
Knot
Curtain
FA4482 Tek Screws with
102921 Neo-Bonded Washers