Revision date: 09.18.14
CLEARSPAN
™
GRO-MAX GOTHIC HIGH TUNNELS
Ground
Level
Inside of
Shelter
Outside of
Shelter
BASEBOARD NOTE
A customer-supplied baseboard and retaining board
are required
to attach the drop-down side curtains. The
baseboard is optional but recommended for a building
with a roll-up side. See the exploded view below.
The baseboard runs the length of the frame at ground
level. The retaining board secures the drop-down curtain
to the baseboard.
The baseboard and retaining board are
supplied by the customer.
Retaining boards are attached during the drop-down
curtain installation. The retaining board is not used when
the building is equipped with a roll-up curtain.
Ground Level
Drop-Down
Curtain
Optional
End Panel
Retaining Board
Baseboard
View shown from outside the shelter.
Fasteners (1/4" x 4" carriage bolts (FAH009B) and FA4652
wood screws) are included. Depending on board width, use
2 carriage bolts per rafter connection for the baseboard
and ribbon board. Evenly space the wood screws at 24".
Countersink heads if needed.
ATTENTION:
A baseboard is not required for buildings with
a roll-up side curtain, but installing a baseboard is strongly
recommended. Fasteners are included to attach the boards
to the frame. Customer supplies baseboard material.
Secure baseboard and ribbon
board joints between rafters
as shown for best results.
RIBBON BOARD REQUIRED: DROP-DOWN SIDES
A customer-supplied two-piece ribbon board is required
for the installation of the drop-down curtain. Fasteners are
included.
Customer supplies the materials for the ribbon
board.
RIBBON BOARD REQUIRED: ROLL-UP SIDES
A customer-supplied ribbon board is required for the
installation of the roll-up curtain. Fasteners are included.
Customer supplies the materials for the ribbon board.
DIAGRAMS ARE NOT TO SCALE.
The diagram
shows a customer-
supplied ribbon
board as attached
to the frame.
Diagram applies to
buildings equipped
with drop-down
side curtains.
2" x 6"
Board
U-Channel
(102197)
End View
1/4" Nut
(FALB01B)
&
Washer
(FAMF01B)
1/4" x 4" Carriage
Bolts (FAH009B)
FA4652 Wood
Screws
Rafter Leg
ATTENTION:
The position of the side ribbon board
for buildings with either drop-down or roll-up sides
can be lowered a few inches to overlap the purlin
clamp. This allows the board to remain on the straight
part of the rafter.
Rafter
2" x 6" Board
1" x 4" Board
FA4652
Wood
Screws
1/4" x 4"
Carriage
Bolts
(FAH009B),
1/4" flat
washers,
and
FALB01B
1/4" nuts.
U-Channel
102197