50
Revision date: 09.18.14
CLEARSPAN
™
GRO-MAX GOTHIC HIGH TUNNELS
END FRAMING - CONNECTION DET
AILS
106755
1/2"
Bolt
&W
as
he
r
1/2"
x5
1/2"
Bolt
Assemb
ly
Guid
eP
os
t
Customer
This
Side
Te
kS
cr
ew
s
Screws
Wood
4"
x4
"
Su
pp
lied
By
107923
3/8"
Thre
aded
Ro
d
Guid
eP
os
t
Rafter
To
Be
Cu
tI
nF
ield
(2
)3
/8
"N
ut
sa
nd
Wash
er
4"
x4
"
Su
pp
lied
By
Customer
ATTENTION:
Panel is not shown. Sink
threaded rod below the surface of the customer-supplied end wall post. See details on page 15.
Threaded rod and rafter are not shown. Roll-up door panel is not shown.
104188B 1/2" bolt, FALB08B nut, & FAME09B washer
FAK16 ROD (cut), FALB04B nuts & FAME08B washer
CUST
OMER-SUPPLIED END FRAME:
Construct the end
frame for the roll-up end panel using 4" x 4" wood posts. The doorframe materials are supplied by the customer
.
If quality 4" x 4" lumber at the lengths needed is not available, construct 2-ply wood beams using 2" x 6" boards secured together with exterior grade bolts and nuts. Center the doorframe in the end wall and dig the holes for the doorjambs.
Stagger all joints. Do not align.
Use treated lumber and
set in concrete for best results.