2
Revision date: 09.18.14
CLEARSPAN
™
GRO-MAX GOTHIC HIGH TUNNELS
YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER
.
Thank you for purchasing this ClearSpan™ high tunnel.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the high tunnel. Please
read these instructions
before
you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on the high tunnel or framing during or
after construction.
• Do not occupy the high tunnel or attempt to install the
curtain during high winds, tornadoes, or hurricanes.
•
Never
attempt to install the curtain during windy or
stormy conditions.
• Assemble and anchor the high tunnel frame
before
installing the drop-down curtain.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the high tunnel.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this high tunnel, please read the
MUST
READ
document included with the shipment.
WARNING:
The anchor assembly is an integral part of
the high tunnel construction. Improper anchoring may
cause high tunnel instability and failure of the structure.
Failing to anchor the high tunnel properly
will void the
manufacturer’s warranty
and may cause serious injury
and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
• Never erect the structure under power lines.
• Identify whether underground cables and pipes are
present
before
preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the high tunnel where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
•
Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help
ensure the integrity of the structure.
•
A level site is required
. The site must be level to
properly and safely erect and anchor the structure.
• If the site is not level, use footings to provide a secure
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used. (Some
shelters use ground posts or rafter feet.)
• Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING:
The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques
must seek the help of a qualified
contractor.
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure the
proper assembly of your high tunnel. Failing to follow these
steps may result in an improperly assembled and anchored
high tunnel and will void all warranty and protection the
owner is entitled.