53
Revision date: 09.18.14
CLEARSPAN
™
GRO-MAX GOTHIC HIGH TUNNELS
Photo shows the fully assembled
drop-down curtain from the inside
of a sample shelter.
Axle Conduit held
in place by 106734
band clamps.
Ribbon Board
Drop-down curtain assembly as
seen from the inside.
106734 Band Clamp
Pulley
Rope
Baseboard
The above photo shows a typical drop-down side curtain as installed on a sample building. This photo applies to
buildings equipped with drop-down sides only. It does not apply to buildings equipped with roll-up sides.
ADDITIONAL PHOTOS PAGE
The above photo shows how to secure the angled purlin to the underside of the assembled rafters and frame. Use
FA4482B Tek screws and QH1070 pipe straps.
End Rafter
Interior Rafter
End of purlins
at interior
rafter.