![Cisco CRS-16-LCC/M Installation Manual Download Page 79](http://html.mh-extra.com/html/cisco/crs-16-lcc-m/crs-16-lcc-m_installation-manual_63756079.webp)
The front and rear views of the modular configuration AC power shelf are shown in the next figures.
Figure 28: AC Modular Configuration Power Shelf—Front View
Figure 29: AC Modular Configuration Power Shelf, Rear View
Prerequisites
Remove the upper grilles from both the front (PLIM) and rear (MSC) sides of the chassis, if installed. Verify
that the power shelf that you are about to install is the correct power shelf.
Cisco CRS Routers 16-Slot Line Card Chassis Installation Guide
59
Installing and Removing Power Components
Prerequisites