3-56
Catalyst 6500 Series Switches Installation Guide
OL-5781-08
Chapter 3 Installing the Switch
Establishing the System Ground
Figure 3-30
System Ground Location (Catalyst 6506, Catalyst 6509, and Catalyst 6509-NEB
Chassis)
32672
INPUT
OK
FAN
OK
OUTPUT
FAIL
o
INPUT
OK
FAN
OK
OUTPUT
FAIL
o
1
2
3
4
5
6
8 PORT GIGABIT ETHERNET
WS-X6408
1
LINK
STATUS
2
3
4
5
6
7
8
LINK
LINK
LINK
LINK
LINK
LINK
LINK
8 PORT GIGABIT ETHERNET
WS-X6408
1
LINK
STATUS
2
3
4
5
6
7
8
LINK
LINK
LINK
LINK
LINK
LINK
LINK
24 PORT 100FX
WS-X6224
STATUS
1
LINK
2
LINK
3
LIN
K
4
LINK
5
LIN
K
6
LINK
7
LINK
8
LINK
9
LINK
10
LINK
11
LINK
12
LIN
K
13
LINK
14
LIN
K
15
LINK
16
LINK
17
LINK
18
LINK
19
LINK
20
LINK
21
LINK
22
LINK
23
LINK
24
LINK
24 PORT 100FX
WS-X6224
STATUS
1
LINK
2
LINK
3
LINK
4
LINK
5
LINK
6
LINK
7
LINK
8
LINK
9
LINK
10
LINK
11
LINK
12
LINK
13
LINK
14
LINK
15
LINK
16
LINK
17
LINK
18
LINK
19
LINK
20
LINK
21
LINK
22
LINK
23
LINK
24
LINK
Grounding
pad
Grounding
pad location
under lip
Grounding lug
Wire
Screws (M4)
FAN
STATUS
SUPERVISOR2
WS-X6K-SUP2-2GE
STAT
US
SYST
EM
C
O
NSO
LE
PWR
M
G
M
T
R
ESE
T
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch Load
100%
1%
LIN
K
LIN
K
SUPERVISOR2
WS-X6K-SUP2-2GE
STAT
US
SYS
TE
M
CO
NS
OL
E
PW
R
M
GM
T
R
ES
ET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch Load
100%
1%
LIN
K
LIN
K