Contents
vii
Catalyst 6500 Series Switches Installation Guide
OL-5781-08
Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
3-21
Installation Accessory Kits
3-21
L Brackets on the Catalyst 6509 and Catalyst 6509-E Switches
3-21
Installing the 3 RU Rack-Mount Shelf Kit
3-22
Rack-Mounting the Chassis
3-23
What is Next
3-25
Optional Installation Kits
3-25
Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis
3-26
Installation Accessory Kits
3-26
L Brackets and the Optional Cable Guide on the Catalyst 6509-NEB Switch
3-26
L Brackets on the Catalyst 6509-NEB-A Switch Chassis
3-27
Installing the 3 RU Rack-Mount Shelf Kit
3-28
Rack-Mounting the Chassis
3-29
Installing the Cable Management System (Catalyst 6509-NEB-A Only)
3-31
What is Next
3-35
Optional Installation Kits
3-35
Installing a Catalyst 6509-V-E Switch Chassis
3-36
Installation Accessory Kit
3-36
L Brackets on the Catalyst 6509-V-E Switch Chassis
3-36
Installing the 3 RU Rack-Mount Shelf
3-37
Rack-Mounting the Chassis
3-38
Installing the Cable Management System (Optional)
3-40
What is Next
3-42
Optional Installation Kits
3-42
Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis
3-42
Installation Accessory Kit
3-42
L Brackets on the Catalyst 6513 and Catalyst 6513-E Switch Chassis
3-43
Installing the 3 RU Rack-Mount Shelf Kit
3-44
Rack-Mounting the Chassis
3-45
What is Next
3-46
Optional Installation Kits
3-47
Generic Installation Procedures
3-47
Installing the 3 RU Rack-Mount Shelf Kit
3-47
Installing the Rubber Feet Kit
3-50
Installing the Stabilizer Bracket Kit
3-50
Establishing the System Ground
3-52
Required Tools and Equipment
3-53
Connecting the System Ground
3-53
Installing the Power Supplies in the Switch Chassis
3-61