Contents
viii
Catalyst 6500 Series Switches Installation Guide
OL-5781-08
Attaching the Interface Cables
3-61
Connecting the Supervisor Engine Console Port
3-61
Connecting the Supervisor Engine Uplink Ports
3-63
Using the Catalyst 6509-V-E Cable Management System
3-78
Verifying Switch Chassis Installation
3-84
Online Diagnostics
3-84
C H A P T E R
4
Removal and Replacement Procedures
4-1
Online Insertion and Removal
4-1
Removing and Installing the AC-Input Power Supplies
4-2
Removing and Installing the 950 W and 1400 W AC-Input Power Supplies
4-3
Removing and Installing the 2700 W AC-Input Power Supply
4-6
Removing and Installing the 1000 W, 1300 W, 2500 W, 3000 W, 4000 W, 6000 W, and 8700 W
AC-Input Power Supplies
4-9
Removing and Installing the DC-Input Power Supplies
4-15
Removing and Installing a 950 W DC-Input Power Supply
4-15
Removing and Installing a 1300 W or 2500 W DC-Input Power Supply
4-19
Removing and Installing the 2700 W DC-Input Power Supply
4-27
Removing and Installing a 4000 W DC-Input Power Supply
4-36
Removing and Installing a 6000 W DC-Input Power Supply
4-58
Removing and Installing PEMs
4-75
Required Tools
4-76
Removing the AC-Input PEM
4-76
Installing the AC-Input PEM
4-78
Removing the DC-Input PEM
4-78
Installing the DC-Input PEM
4-80
Removing and Installing the Fan Tray
4-82
Required Tools
4-82
Removing the Fan Tray
4-83
Installing the Fan Assembly
4-92
Checking the Installation
4-92
Installing the Air Filter Assembly on a Catalyst 6509-NEB-A Switch or a Catalyst 6509-V-E
(Optional)
4-93
Checking the Air Filter
4-98
Installing the Remote Power Cycling Feature Control Wires (Optional)
4-98
Required Tools and Components
4-99
Installing the Remote Power-Cycling Control Wires
4-99
Installing the Ferrite Bead
4-100