Contents
6
Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide
OL-11497-03
Compliance and Safety Information
2-5
Laser Safety
2-5
Lifting Guidelines
2-5
Preventing Electrostatic Discharge Damage
2-6
Attaching an ESD-Preventive Strap
2-7
Safety with Electricity
2-8
Site Requirement Guidelines
2-9
Environmental Guidelines
2-9
Airflow
2-9
Temperature and Humidity
2-10
Rack-Mounting Guidelines
2-10
Types of Equipment Racks
2-10
Equipment Dimensions and Site Layout
2-11
Ventilation
2-13
Power Connection Guidelines
2-14
Power Connection Guidelines for AC-Powered Routers
2-14
Power Connection Guidelines for DC-Powered Routers
2-16
Grounding Connections
2-16
Site Wiring
2-20
Electromagnetic Interference
2-20
Distance Limitations
2-20
Unpacking and Repacking the Router
2-21
Site Preparation Checklist
2-22
C H A P T E R
3
Installing the Router
3-1
Installing a Router
3-2
Installing the Rack-Mount Brackets (Optional)
3-3
Tools and Equipment Required
3-3
Installing the Optional Rack-Mount Brackets
3-3