6-73
Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide
OL-11497-03
Chapter 6 Maintaining the Router
Removing and Installing the Chassis
Remove each CSC from its slot in the defective chassis as instructed in the
“Removing a Clock and Scheduler Card” section on page 6-58
. Immediately
install the CSC in the same slot of the replacement chassis as instructed in the
“Installing a Clock and Scheduler Card” section on page 6-59
.
Remove each SFC from its slot as instructed in the
“Removing a Switch Fabric
Card” section on page 6-62
. Immediately install the SFC in the same slot of the
replacement chassis as instructed in the
“Installing a Switch Fabric Card” section
on page 6-63
.
Remove each alarm card from its slot in the defective chassis as instructed in the
“Removing an Alarm Card” section on page 6-66
. Immediately install the alarm
card in the same slot of the replacement chassis as instructed in the
“Installing an
Alarm Card” section on page 6-66
.
Transferring the Power Modules
For systems equipped with AC-input power supplies, remove each power supply
as instructed in the
“Removing and Replacing an AC PEM” section on page 6-18
.
Immediately install each PEM in the same bay of the replacement chassis.
For systems equipped with DC-input PEMs, remove each PEM as instructed in the
“Removing and Replacing a DC PEM” section on page 6-31
. Immediately install
each PEM in the same bay of the replacement chassis.
Transferring the Blower Module
Remove the blower module from the chassis as instructed in the
“Removing and
Replacing the Blower Module” section on page 6-9
.
Note
Set the blower module safely aside temporarily. You will install it on the
replacement chassis in a later procedure.
Transferring the Power Distribution Unit
Follow the instructions in the
“Removing and Installing the Chassis” section on
page 6-68
to remove the PDU from the defective chassis and install it in the
replacement chassis.