9 CVT system
9
9-5
Gearbox assy.
Disassembly
Remove left side cover.(9-3)
Fix the gearbox and clutch well with jig, loosen the
tightening nut and washer for gearbox with socket
wrench..
Special tools:
Special jig: 1P52MI-A-922-040000
Remove primary sheave and V-belt.
Hold the inner side of primary sliding sheave, remove
the collar for slider
Dismantling
Remove the collar for slider.
Summary of Contents for CF125T-19 2003
Page 1: ...WWW CFMOTO COM CFMOTO CF125T 19 SERVICE MANUAL CF150T VERSION A...
Page 2: ...All right reserved ZHEJIANG HONGQIAO POWER MANUFACTURING CO LTD 2003 5 WWW CFMOTO COM...
Page 23: ...1 19 1 Overhaul Information 1 Wiring Piping Diagram...
Page 24: ...1 20 CFMOTO...
Page 25: ...1 21 1 Overhaul Information 1...
Page 26: ...1 22 CFMOTO...
Page 27: ...1 23 1 Overhaul Information 1...
Page 28: ...1 24 CFMOTO...
Page 29: ...1 25 1 Overhaul Information 1...
Page 48: ...2 17 2 Vehicle body muffler 2 Outer Components...
Page 91: ...5 17 5 carburetor air filter secondary air inlet 5 Air cleaner Assembly...
Page 100: ...6 9 6 cooling system 6 Cooling System...
Page 158: ...10 8 CFMOTO...
Page 208: ...15 Battery Charging system 15 15 9...
Page 215: ...16 16 7 16 Ignition system...
Page 235: ...19 1 CFMOTO 19 Electrical Diagram...
Page 236: ...19 Electrical Diagram 19 2 CFMOTO...