8-22
CFMOTO
Install the sprocket to camshaft, keep the mark on
sprocket in parallel with cylinder head surface.
Install timing chain to the sprocket.
Install tightening bolt for camshaft sprocket.
Torque
: 9 N. m (0.9kgf.m)
Caution
Before adjusting the valve clearance, check
if the mark on the sprocket is in parallel with
cylinder head surface and the groove opening
of camshaft neck is upwards.
Press the block on the tensioner, and push the
tensioning rack back into the tensioner. Tighten the
bolt according to the specified torque.
Torque: 10 N. m (1.0kgf.m)
Install the tensioner bolt and tighten it. (8-7)
Install carburetor joint gasket, carburetor joint and
tighten with bolt.
Install vacuum tube..
Summary of Contents for CF125T-19 2003
Page 1: ...WWW CFMOTO COM CFMOTO CF125T 19 SERVICE MANUAL CF150T VERSION A...
Page 2: ...All right reserved ZHEJIANG HONGQIAO POWER MANUFACTURING CO LTD 2003 5 WWW CFMOTO COM...
Page 23: ...1 19 1 Overhaul Information 1 Wiring Piping Diagram...
Page 24: ...1 20 CFMOTO...
Page 25: ...1 21 1 Overhaul Information 1...
Page 26: ...1 22 CFMOTO...
Page 27: ...1 23 1 Overhaul Information 1...
Page 28: ...1 24 CFMOTO...
Page 29: ...1 25 1 Overhaul Information 1...
Page 48: ...2 17 2 Vehicle body muffler 2 Outer Components...
Page 91: ...5 17 5 carburetor air filter secondary air inlet 5 Air cleaner Assembly...
Page 100: ...6 9 6 cooling system 6 Cooling System...
Page 158: ...10 8 CFMOTO...
Page 208: ...15 Battery Charging system 15 15 9...
Page 215: ...16 16 7 16 Ignition system...
Page 235: ...19 1 CFMOTO 19 Electrical Diagram...
Page 236: ...19 Electrical Diagram 19 2 CFMOTO...