
Spirit™ Bed Owner’s Manual – 1-70-001 – Rev D
© Carroll Hospital Group Inc.
Page 28 of 110
7.
Install four corner mattress
keepers. See page 32 for
installation instructions.
8.
Install siderails. See page 29
for installation instructions.
9.
Unpack the headboard and
footboard from their separate
packaging box.
10.
Place the headboard into the
bracket assembly at the head
end of the bed.
Ensure that the headboard is
oriented as shown before
attempting insertion into
mounting bracket.
The headboard posts face
towards the wall.
11.
Place the footboard into the
bracket assembly at the foot
end of the bed.
Ensure that the footboard is
oriented as shown before
attempting insertion into
mounting bracket.
The staff control faces away
from the bed.
12.
Connect the footboard staff
control cord.
13.
Fasten the bolts through the
holes in both sides of the
brackets and posts. This will
ensure that the footboard is
not accidentally removed
before the footboard cord is
disconnected.
14.
Initialize the bed for use:
Lower the bed using either
the footboard staff control or
the pendant.
Once the lower limit is
reached continue to hold the
DOWN button for an
additional 10 seconds.
This process will synchronize
the actuators so that the bed
will perform properly over
time.
15.
Your Spirit™ bed is now
ready for use.
Summary of Contents for Spirit
Page 2: ...Spirit Bed Owner s Manual 1 70 001 Rev D Carroll Hospital Group Inc Page 2 of 110 ...
Page 10: ...Spirit Bed Owner s Manual 1 70 001 Rev D Carroll Hospital Group Inc Page 10 of 110 ...
Page 22: ...Spirit Bed Owner s Manual 1 70 001 Rev D Carroll Hospital Group Inc Page 22 of 110 ...
Page 82: ...Spirit Bed Owner s Manual 1 70 001 Rev D Carroll Hospital Group Inc Page 82 of 110 ...