docs.carbide3d.com
56
Required Components
See
Figure 9-2
:
Item
Description
Location
Qty
A
Cable Tie Mounts
Wiring Harness Box
5
B
M4 x 6mm Socket Head Cap Screw
Wiring Harness Box
5
C
Cable Ties
Wiring Harness Box
11
D
Shapeoko Decal
XXL Assembly Box
1
Required Tools
See
Figure 9-3
:
Item
Description
Qty
A
3mm Hex Key
1
B
Cut Pliers or Scissors (not included)
1
C
Sharpie Permanent Marker
1
Cleanup the Gantry Cables
In this step, we’ll be securing loose cables with cable ties and cable tie mounts.
Securing Cables at the Y1-Carriage
All seven (7) cables crossing the Y1-carriage plate, are bundled into the circular cutout at the top of the carriage.
1.
One at a time insert the cables, beginning with the three Y-cables, followed by the four X/Z-cables. See
Figure 9-4
.
2.
Use two (2) cable ties, one on each side of the cutout, to secure the cables in place as shown in
Figure 9-4
.
Figure 9-3
Figure 9-4
Summary of Contents for SHAPEOKO XXL
Page 1: ...X X L A S S E MB L Y G U I D E ...
Page 14: ...docs carbide3d com 12 Figure 2 2 Step 2 Baseframe ...
Page 20: ...docs carbide3d com 18 Figure 3 2 Step 3 Carriages ...
Page 29: ...support carbide3d com 27 Figure 4 2 Step 4 Gantry ...
Page 34: ...docs carbide3d com 32 Figure 5 2 Step 5 Belting ...
Page 40: ...docs carbide3d com 38 Figure 6 2 Step 6 Drag Chains ...
Page 48: ...docs carbide3d com 46 Figure 7 2 Step 7 Proximity Switches ...
Page 52: ...docs carbide3d com 50 Figure 8 2 Step 8 Wiring ...
Page 57: ...support carbide3d com 55 Figure 9 2 Step 9 Cleanup ...
Page 60: ...docs carbide3d com 58 Figure 10 2 Step 10 Compact Router ...