![Carbide3D SHAPEOKO XXL Assembly Manual Download Page 31](http://html.mh-extra.com/html/carbide3d/shapeoko-xxl/shapeoko-xxl_assembly-manual_2555638031.webp)
29
Assemble the Gantry
In this step, we’ll be connecting the Y1
- and Y2-rails to
their respective carriages, and then to the baseframe.
Pay very close attention to the positioning of the two rails
in
Figure 4-4
. Proper identification of the Y-rails is crucial.
The Y1-rail will be installed on the left, the Y2-rail on the
right.
Positioning the X-Rail
1.
Position the X-rail with attached carriages
diagonally across the baseframe. See
Figure 4-6
.
Figure 4-4
Figure 4-5
Figure 4-6
PRO TIP:
Test fit the Y1- and Y2-rails between
the endplates. If the fit is too tight, loosen the
twelve (12) screws holding the MDF baseplates to
the endplate
s to give you more room to “tilt” the
endplates apart. See
Figure 4-5
.
Summary of Contents for SHAPEOKO XXL
Page 1: ...X X L A S S E MB L Y G U I D E ...
Page 14: ...docs carbide3d com 12 Figure 2 2 Step 2 Baseframe ...
Page 20: ...docs carbide3d com 18 Figure 3 2 Step 3 Carriages ...
Page 29: ...support carbide3d com 27 Figure 4 2 Step 4 Gantry ...
Page 34: ...docs carbide3d com 32 Figure 5 2 Step 5 Belting ...
Page 40: ...docs carbide3d com 38 Figure 6 2 Step 6 Drag Chains ...
Page 48: ...docs carbide3d com 46 Figure 7 2 Step 7 Proximity Switches ...
Page 52: ...docs carbide3d com 50 Figure 8 2 Step 8 Wiring ...
Page 57: ...support carbide3d com 55 Figure 9 2 Step 9 Cleanup ...
Page 60: ...docs carbide3d com 58 Figure 10 2 Step 10 Compact Router ...