17
Screw in the Adjustable Leveling Feet
1.
Carefully lift each corner of the baseframe and screw in the four adjustable leveling feet, two per endplate, as
shown in
Figure 2-13
.
2.
Screw in each adjustable leveling foot until it is flush with the endplate as shown in
Figure 2-13.
Level the Machine
1.
Adjust the leveling feet to bring the fully
assembled baseframe into level. Check front-to-
back, side-to-side, and diagonally. See
Figure 2-14
.
Optionally, if you wish to check for square now, you can
do so by measuring diagonally across the baseframe from
the outside edges of the endplates. Check both sides. The
machine is square when the two measurements are equal.
See
Figure 2-14
.
Approximates are acceptable at this stage as the machine
is not fully tightened. A final and more comprehensive
leveling and squaring of the machine will be completed in
Step 11: Level and Square.
Figure 2-13
Figure 2-14
WARNING:
The baseframe assembly is heavy. It is recommended you complete this step with the help of
another person. When lifting only one corner of the machine at a time, do not lift any higher than is necessary
to insert the leveling foot. Alternately, lifting from the center of one endplate and inserting a suitable wedge
is acceptable.
Summary of Contents for SHAPEOKO XXL
Page 1: ...X X L A S S E MB L Y G U I D E ...
Page 14: ...docs carbide3d com 12 Figure 2 2 Step 2 Baseframe ...
Page 20: ...docs carbide3d com 18 Figure 3 2 Step 3 Carriages ...
Page 29: ...support carbide3d com 27 Figure 4 2 Step 4 Gantry ...
Page 34: ...docs carbide3d com 32 Figure 5 2 Step 5 Belting ...
Page 40: ...docs carbide3d com 38 Figure 6 2 Step 6 Drag Chains ...
Page 48: ...docs carbide3d com 46 Figure 7 2 Step 7 Proximity Switches ...
Page 52: ...docs carbide3d com 50 Figure 8 2 Step 8 Wiring ...
Page 57: ...support carbide3d com 55 Figure 9 2 Step 9 Cleanup ...
Page 60: ...docs carbide3d com 58 Figure 10 2 Step 10 Compact Router ...