![Canon imageRUNNER ADVANCE C9065S PRO Operating Information Manual Download Page 375](http://html.mh-extra.com/html/canon/imagerunner-advance-c9065s-pro/imagerunner-advance-c9065s-pro_operating-information-manual_57849375.webp)
Value
Specification
1120 x 932 x 1400 mm/44" x 36.7" x 55.12"
(with automatic document feeder, operator panel)
(H, incl. operator attention light) 1650 mm/94.96"
(W, operating panel in most right position) 1275 mm/50.2"
Dimensions main en-
gine (WxDxH)
304 kg/670 lbs
(with toner, automatic document feeder, operator panel,
and PRISMAsync controller)
Operator attention light: approx. 1 kg/2.2 lbs
Weight main engine
E-shredding option provides HDD erase functionality
Optional removable engine HDD
Security
EPA Energy Star, RoHS
Certificates
Maximum power consumption: 2.68 kW
Power consumption
imageRUNNER ADVANCE C9075S PRO: 17.48 KWh
imageRUNNER ADVANCE C9065S PRO: 16.00 KWh
TEC
PRISMAsync controller (also feeding operating panel/oper-
ator warning light): 100–240 VAC, 10–5 A, 50–60Hz
imageRUNNER ADVANCE C9075S PRO/C9065S
PRO:208 VAC, 15 A, 60 Hz
Power requirements
Environmental
#
Value
Specification
Standby mode: 58 dB
Print mode: 75 dB
Sound power level
Initial startup: maximum 0.01 parts per million
After short break-in period: maximum 0.035 parts per
million
Ozone emissions
15–27.5°C
59°F–81.5°F
Optimum temperature
25%–75%
Relative humidity
Chapter 12 - Specifications
375
Specifications
Summary of Contents for imageRUNNER ADVANCE C9065S PRO
Page 1: ...Please read this guide before operating this product Operating Information ENG ...
Page 7: ...Chapter 1 Preface ...
Page 15: ...Chapter 2 Main parts ...
Page 51: ... Overview of the machine configuration on page 16 Chapter 2 Main parts 51 Inserter ...
Page 58: ...Chapter 2 Main parts 58 Folder ...
Page 59: ...Chapter 3 Operating concept ...
Page 82: ...Chapter 3 Operating concept 82 Manage production printing ...
Page 83: ...Chapter 4 Operator panel views ...
Page 92: ...Chapter 4 Operator panel views 92 The System view ...
Page 93: ...Chapter 5 Power information ...
Page 100: ...Chapter 5 Power information 100 Use the Sleep mode ...
Page 101: ...Chapter 6 Print jobs ...
Page 123: ... Delete print jobs on page 128 Chapter 6 Print jobs 123 Reprint a job ...
Page 169: ...Chapter 7 Copy jobs ...
Page 213: ...Chapter 8 Scan jobs ...
Page 233: ...Chapter 9 Paper toner and staples ...
Page 317: ...Chapter 10 Adapt printer settings to your needs ...
Page 343: ...Chapter 11 Maintenance and calibra tion ...
Page 369: ...Chapter 12 Specifications ...
Page 390: ...Chapter 12 Specifications 390 Specifications ...
Page 391: ...Chapter 13 Third party software ...